Assessment Year | 2011 |
---|---|
Principal Product | Diaphragm seals |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
87,000
ft2
|
Annual Production | 65,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,078 | 2,684,000 |
kWh
|
$0.077 |
Electricity Demand | $37,654 | 6,549 |
kW-mo/yr
|
$5.75 |
Electricity Fees | $8,662 | - |
|
- |
Natural Gas | $1,216 | 69 |
MMBtu
|
$17.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,180 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7311: Ventilation system to shut off when room is not in use | $21,840 | - |
$21,840
273,000
kWh
|
- | |
02 | 2.3134: Shift from daytime to nighttime operation | $6,900 | - | - |
$6,900
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,470 | $750 |
$3,030
37,900
kWh
|
$440
-
kW-mo/yr
|
|
04 | 2.7124: Make a practice of turning off lights when not needed | $1,970 | - |
$1,700
21,360
kWh
|
$270
-
kW-mo/yr
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $1,070 | $1,748 |
$1,070
13,400
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $800 | - |
$700
8,700
kWh
|
$100
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $36,050 | $2,498 |
$28,340
354,360
kWh
|
$7,710
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $34,180 | $750 |
$26,570
332,260
kWh
|
$7,610
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs