Assessment Year | 2011 |
---|---|
Principal Product | chemicals |
NAICS | 325199: All Other Basic Organic Chemical Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 110 |
Plant Area |
150,000
ft2
|
Annual Production | 90,000
Tgal
|
Production Hrs. Annual | 2,510
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $124,145 | 2,205,000 |
kWh
|
$0.056 |
Electricity Demand | $43,166 | 9,944 |
kW-mo/yr
|
$4.34 |
Electricity Fees | $449 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $79,289 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $74,000 | $26,000 |
$76,000
1,033,000
kWh
|
$23,000
-
kW-mo/yr
|
$(-25,000.0)
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,850 | - | - |
$1,850
-
kW-mo/yr
|
- | |
03 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,246 | $180 |
$1,081
14,610
kWh
|
$165
-
kW-mo/yr
|
- | |
04 | 2.6215: Shut off air conditioning in winter heating season | $1,150 | - |
$910
12,300
kWh
|
$240
-
kW-mo/yr
|
- | |
05 | 2.2136: Install / repair insulation on steam lines | $650 | $270 |
$650
8,790
kWh
|
- | - | |
06 | 2.4314: Use synthetic lubricant | $393 | - |
$393
5,300
kWh
|
- | - | |
TOTAL RECOMMENDED | $79,289 | $26,450 |
$79,034
1,074,000
kWh
|
$25,255
-
kW-mo/yr
|
$(-25,000.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,500 | $270 |
$650
8,790
kWh
|
$1,850
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs