ITAC Assessment: AM0594
ITAC logo
ITAC Assessment: AM0594
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product chemicals
NAICS 325199: All Other Basic Organic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 110
Plant Area 150,000
ft2
Annual Production 90,000
Tgal
Production Hrs. Annual 2,510
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $124,145 2,205,000
kWh
Electricity Demand $43,166 9,944
kW-mo/yr
Electricity Fees $449 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $74,000 $26,000 $76,000
1,033,000
kWh
$23,000
-
kW-mo/yr
$(-25,000.0)
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,850 - - $1,850
-
kW-mo/yr
-
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,246 $180 $1,081
14,610
kWh
$165
-
kW-mo/yr
-
04 2.6215: Shut off air conditioning in winter heating season $1,150 - $910
12,300
kWh
$240
-
kW-mo/yr
-
05 2.2136: Install / repair insulation on steam lines $650 $270 $650
8,790
kWh
- -
06 2.4314: Use synthetic lubricant $393 - $393
5,300
kWh
- -
TOTAL RECOMMENDED $79,289 $26,450 $79,034
1,074,000
kWh
$25,255
-
kW-mo/yr
$(-25,000.0)
-
MMBtu
TOTAL IMPLEMENTED $2,500 $270 $650
8,790
kWh
$1,850
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs