| Assessment Year | 2011 |
|---|---|
| Principal Product | Cement |
| NAICS | 327310: Cement Manufacturing |
| SIC | 3241: Cement, Hydraulic |
| Sales Range | $50 M to 100M |
| # of Employees | 112 |
| Plant Area |
750,000
ft2
|
| Annual Production | 750,000
ton
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,161,117 | 82,894,714 |
kWh
|
$0.038 |
| Electricity Demand | $1,392,742 | 173,326 |
kW-mo/yr
|
$8.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $151,920 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $25,620 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $106,400 | - | - |
$106,400
-
kW-mo/yr
|
|
| 02 | 2.4323: Use optimum size and capacity equipment | $19,900 | $2,600 |
$19,900
524,000
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,900 | $1,000 |
$8,000
211,000
kWh
|
$2,900
-
kW-mo/yr
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,600 | $6,900 |
$6,300
166,000
kWh
|
$2,300
-
kW-mo/yr
|
|
| 05 | 2.7124: Make a practice of turning off lights when not needed | $4,260 | $500 |
$2,460
64,700
kWh
|
$1,800
-
kW-mo/yr
|
|
| 06 | 2.6218: Turn off equipment when not in use | $1,860 | $364 |
$1,860
49,000
kWh
|
- | |
| TOTAL RECOMMENDED | $151,920 | $11,364 |
$38,520
1,014,700
kWh
|
$113,400
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $25,620 | $8,764 |
$18,620
490,700
kWh
|
$7,000
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs