ITAC Assessment: AM0585
ITAC logo
ITAC Assessment: AM0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Plastic profile extrusions
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 87,540
ft2
Annual Production 648,000
lb
Production Hrs. Annual 5,400
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,836 2,324,097
kWh
Electricity Demand $68,249 9,978
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,400 $20,200 $9,500
128,000
kWh
$1,900
-
kW-mo/yr
-
02 3.5315: Lease / purchase baler; sell cardboard to recycler $9,140 - - - $9,140
-
lb
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,290 $600 $6,900
93,600
kWh
$1,390
-
kW-mo/yr
-
04 2.3212: Optimize plant power factor $4,500 $10,480 - $4,500
-
kW-mo/yr
-
05 2.7124: Make a practice of turning off lights when not needed $1,950 $270 $1,560
21,070
kWh
$390
-
kW-mo/yr
-
06 2.4314: Use synthetic lubricant $820 - $700
9,400
kWh
$120
-
kW-mo/yr
-
07 2.6218: Turn off equipment when not in use $105 - $105
1,400
kWh
- -
TOTAL RECOMMENDED $36,205 $31,550 $18,765
253,470
kWh
$8,300
-
kW-mo/yr
$9,140
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs