ITAC Assessment: AM0584
ITAC logo
ITAC Assessment: AM0584
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Crushed limestone
NAICS 327991: Cut Stone and Stone Product Manufacturing
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 400,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 3,744
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $642,342 16,127,157
kWh
Electricity Demand $840,066 89,164
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $50,440 $125,600 $19,440
486,000
kWh
$31,000
-
kW-mo/yr
- -
02 3.2176: Increase use of automation $28,100 $14,000 - - $28,100 -
03 2.4314: Use synthetic lubricant $10,225 - $5,125
128,135
kWh
$5,100
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $3,880 - $1,120
28,100
kWh
$2,760
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,115 $6,560 $1,450
36,300
kWh
$1,665
-
kW-mo/yr
- -
06 2.8123: Pay utility bills on time $1,680 - - - - $1,680
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $880 $135 $540
13,440
kWh
$340
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $610 $100 $280
7,100
kWh
$330
-
kW-mo/yr
- -
TOTAL RECOMMENDED $98,930 $146,395 $27,955
699,075
kWh
$41,195
-
kW-mo/yr
$28,100 $1,680
TOTAL IMPLEMENTED $53,610 $125,835 $20,260
506,540
kWh
$31,670
-
kW-mo/yr
- $1,680
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs