ITAC Assessment: AM0575
ITAC logo
ITAC Assessment: AM0575
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Abrasives
NAICS 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3291: Abrasive Products
Sales Range $50
M
to 100
M
# of Employees 460
Plant Area 325,000
ft2
Annual Production 240,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $682,875 9,908,849
kWh
Electricity Demand $148,406 25,747
kW-mo/yr
Electricity Fees $18,181 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $192,578 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $68,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $64,600 $5,000 $55,200
795,000
kWh
$9,400
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $46,350 $78,700 $39,600
570,000
kWh
$6,750
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $20,350 $9,350 $15,650
225,200
kWh
$4,700
-
kW-mo/yr
- -
04 4.513: Re-arrange equipment layout to reduce labor costs $18,870 $170,000 $2,070
29,800
kWh
- $16,800 -
05 2.3212: Optimize plant power factor $18,400 $54,200 - $18,400
-
kW-mo/yr
- -
06 2.7145: Install skylights $13,790 $68,500 $13,790
198,400
kWh
- - -
07 2.3212: Optimize plant power factor $5,523 $8,520 - $5,523
-
kW-mo/yr
- -
08 2.7124: Make a practice of turning off lights when not needed $2,950 $450 $2,300
33,140
kWh
$650
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,000 $460 $205
2,940
kWh
$25
-
kW-mo/yr
- $770
10 2.4314: Use synthetic lubricant $745 - $640
9,200
kWh
$105
-
kW-mo/yr
- -
TOTAL RECOMMENDED $192,578 $395,180 $129,455
1,863,680
kWh
$45,553
-
kW-mo/yr
$16,800 $770
TOTAL IMPLEMENTED $68,550 $5,910 $57,705
831,080
kWh
$10,075
-
kW-mo/yr
- $770
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs