ITAC Assessment: AM0574
ITAC logo
ITAC Assessment: AM0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Carbonated soft drinks
NAICS 311930: Flavoring Syrup and Concentrate Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 320,000
ft2
Annual Production 22,685,034
pieces
Production Hrs. Annual 5,773
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $545,600 11,608,476
kWh
Electricity Demand $212,700 28,944
kW-mo/yr
Natural Gas $194,598 32,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 3.4151: Minimize water usage $24,800 $10,000 - - - - - $24,800
-
Tgal
02 2.1232: Keep boiler tubes clean $7,100 $5,000 - - - $7,100
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,590 $52,875 $5,900
128,160
kWh
$2,360
-
kW-mo/yr
- - $(-1,670.0) -
04 2.4133: Use most efficient type of electric motors $4,336 $31,683 $3,097
67,335
kWh
$1,239
-
kW-mo/yr
- - - -
05 2.4314: Use synthetic lubricant $1,845 - $1,320
28,600
kWh
$525
-
kW-mo/yr
- - - -
06 2.7124: Make a practice of turning off lights when not needed $1,460 - $960
20,800
kWh
$500
-
kW-mo/yr
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,410 $700 $1,000
22,100
kWh
$410
-
kW-mo/yr
- - - -
08 2.7124: Make a practice of turning off lights when not needed $545 - $545
11,860
kWh
- - - - -
09 2.2511: Insulate bare equipment $240 $185 - - - $240
-
MMBtu
- -
10 2.8118: Check for accuracy of utility / power meters $111 - - - $111 - - -
TOTAL RECOMMENDED $48,437 $100,443 $12,822
278,855
kWh
$5,034
-
kW-mo/yr
$111 $7,340
-
MMBtu
$(-1,670.0) $24,800
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs