ITAC Assessment: AM0567
ITAC logo
ITAC Assessment: AM0567
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product metal tubing
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 115,000
ft2
Annual Production 24,000
thousand feet
Production Hrs. Annual 5,620
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,701 1,845,000
kWh
Electricity Demand $21,604 5,235
kW-mo/yr
Electricity Fees $428 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $4,925 $1,020 $2,835
41,700
kWh
$2,090
-
kW-mo/yr
-
02 4.426: Modify workload $3,265 $500 $75
1,120
kWh
$190
-
kW-mo/yr
$3,000
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,035 $20 $910
13,400
kWh
$125
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $668 $305 $130
1,960
kWh
$13
-
kW-mo/yr
$525
TOTAL RECOMMENDED $9,893 $1,845 $3,950
58,180
kWh
$2,418
-
kW-mo/yr
$3,525
TOTAL IMPLEMENTED $3,933 $805 $205
3,080
kWh
$203
-
kW-mo/yr
$3,525
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs