ITAC Assessment: AM0562
ITAC logo
ITAC Assessment: AM0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Computer enclosures and racks
NAICS 332439: Other Metal Container Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 82,000
ft2
Annual Production 47,500
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,733 2,725,400
kWh
Electricity Demand $34,200 5,041
kW-mo/yr
Natural Gas $91,396 8,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7226: Use computer programs to optimize hvac performance $40,000 $33,800 $40,000
533,500
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,050 $2,000 $9,740
129,800
kWh
$2,310
-
kW-mo/yr
-
03 2.7124: Make a practice of turning off lights when not needed $685 $120 $435
5,800
kWh
$250
-
kW-mo/yr
-
04 2.7124: Make a practice of turning off lights when not needed $685 $120 $435
5,800
kWh
$250
-
kW-mo/yr
-
05 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $500 $2,275 $500
6,670
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $470 $53 $380
5,060
kWh
$90
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $123 $52 $18
245
kWh
$2
-
kW-mo/yr
$103
TOTAL RECOMMENDED $54,513 $38,420 $51,508
686,875
kWh
$2,902
-
kW-mo/yr
$103
TOTAL IMPLEMENTED $52,550 $38,075 $50,240
669,970
kWh
$2,310
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs