Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product metal and fiber drums
NAICS 332439: Other Metal Container Manufacturing
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 112
Plant Area 180,000
ft2
Annual Production 2,064,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,969 5,705,697
kWh
Electricity Demand $117,825 17,037
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,274 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $59,900 $3,000 $48,000
565,000
kWh
$11,900
-
kW-mo/yr
- - -
02 3.6192: Use a less expensive method of waste removal $6,000 $37,000 - - - $6,000
-
Tgal
-
03 2.6218: Turn off equipment when not in use $5,055 - $365
4,300
kWh
- - - $4,690
04 2.4133: Use most efficient type of electric motors $3,585 - $2,615
30,500
kWh
$970
-
kW-mo/yr
- - -
05 3.6192: Use a less expensive method of waste removal $2,100 - - - - $2,100
-
Tgal
-
06 2.4314: Use synthetic lubricant $1,565 - $1,180
13,900
kWh
$385
-
kW-mo/yr
- - -
07 2.7124: Make a practice of turning off lights when not needed $930 $280 $730
8,600
kWh
$200
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $740 $360 $170
1,960
kWh
$20
-
kW-mo/yr
- - $550
09 2.7124: Make a practice of turning off lights when not needed $865 $500 $715
8,415
kWh
$150
-
kW-mo/yr
- - -
10 2.8123: Pay utility bills on time $2,534 - - - $2,534 - -
TOTAL RECOMMENDED $83,274 $41,140 $53,775
632,675
kWh
$13,625
-
kW-mo/yr
$2,534 $8,100
-
Tgal
$5,240
TOTAL IMPLEMENTED $75,174 $4,140 $53,775
632,675
kWh
$13,625
-
kW-mo/yr
$2,534 - $5,240
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings