| Assessment Year | 2008 |
|---|---|
| Principal Product | Asphalt roofing shingles |
| NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
| SIC | 2952: Asphalt Felts and Coatings |
| Sales Range | $50 M to 100M |
| # of Employees | 84 |
| Plant Area |
131,300
ft2
|
| Annual Production | 150,000
thousand feet
|
| Production Hrs. Annual | 7,968
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $608,882 | 6,814,179 |
kWh
|
$0.089 |
| Electricity Demand | $109,063 | 13,332 |
kW-mo/yr
|
$8.18 |
| Electricity Fees | $2,692 | - |
|
- |
| Natural Gas | $672,391 | 90,923 |
MMBtu
|
$7.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $161,620 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $141,730 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $80,000 | $960 |
$80,000
930,000
kWh
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,080 | $1,500 |
$20,900
243,000
kWh
|
$3,180
-
kW-mo/yr
|
- | - | |
| 03 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $19,260 | $80,000 |
$16,700
195,000
kWh
|
$2,560
-
kW-mo/yr
|
- | - | |
| 04 | 2.3212: Optimize plant power factor | $19,840 | $30,650 | - |
$19,840
-
kW-mo/yr
|
- | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,380 | - |
$10,750
125,000
kWh
|
$1,630
-
kW-mo/yr
|
- | - | |
| 06 | 2.7124: Make a practice of turning off lights when not needed | $4,970 | $500 |
$3,790
44,100
kWh
|
$1,180
-
kW-mo/yr
|
- | - | |
| 07 | 2.2511: Insulate bare equipment | $630 | $800 | - | - |
$630
-
MMBtu
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $460 | $325 |
$110
1,260
kWh
|
$14
-
kW-mo/yr
|
- | $336 | |
| TOTAL RECOMMENDED | $161,620 | $114,735 |
$132,250
1,538,360
kWh
|
$28,404
-
kW-mo/yr
|
$630
-
MMBtu
|
$336 | ||
| TOTAL IMPLEMENTED | $141,730 | $33,935 |
$115,550
1,343,360
kWh
|
$25,844
-
kW-mo/yr
|
- | $336 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs