ITAC Assessment: AM0550
ITAC logo
ITAC Assessment: AM0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product oil and gas well drill bits
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 744
Plant Area 290,000
ft2
Annual Production 26,224
pieces
Production Hrs. Annual 6,384
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,068,104 19,710,043
kWh
Electricity Demand $232,973 35,144
kW-mo/yr
Electricity Fees $32,681 -
Natural Gas $510,797 54,758
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $222,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,115

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $110,000 $84,000 $99,600
1,912,000
kWh
$10,400
-
kW-mo/yr
- - -
02 2.2424: Use heat in flue gases to preheat products or materials $50,000 $252,000 - - $50,000
-
MMBtu
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $30,260 - $30,260
580,855
kWh
- - - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $14,250 $220 - - - $14,250 -
05 2.3191: Use demand controller or load shedder $6,130 - - $6,130
-
kW-mo/yr
- - -
06 3.4115: Recover and reuse cooling water $4,850 $27,325 - - - - $4,850
-
Tgal
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,925 $700 $3,100
59,500
kWh
$825
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $1,800 $640 $1,800
34,530
kWh
- - - -
09 2.1233: Analyze flue gas for proper air/fuel ratio $1,130 $500 - - $1,130
-
MMBtu
- -
10 2.4239: Eliminate or reduce compressed air usage $450 $1,260 $450
8,730
kWh
- - - -
TOTAL RECOMMENDED $222,795 $366,645 $135,210
2,595,615
kWh
$17,355
-
kW-mo/yr
$51,130
-
MMBtu
$14,250 $4,850
-
Tgal
TOTAL IMPLEMENTED $37,115 $1,840 $35,160
674,885
kWh
$825
-
kW-mo/yr
$1,130
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs