ITAC Assessment: AM0547
ITAC logo
ITAC Assessment: AM0547
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Carbon black LDPE and HDPE resins
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 147,000
ft2
Annual Production 80,000,000
lb
Production Hrs. Annual 6,072
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,061,839 13,027,030
kWh
Electricity Demand $189,789 39,258
kW-mo/yr
Electricity Fees $2,607 -
Natural Gas $47,258 7,685
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $65,750 $20,000 - - $65,750
-
MMBtu
-
02 2.3212: Optimize plant power factor $27,000 $28,900 - $27,000
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,020 $22,260 $12,950
154,200
kWh
$1,815
-
kW-mo/yr
- $255
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,600 $700 $12,800
152,800
kWh
$1,800
-
kW-mo/yr
- -
05 2.7124: Make a practice of turning off lights when not needed $7,000 - $5,500
65,510
kWh
$1,500
-
kW-mo/yr
- -
06 2.4314: Use synthetic lubricant $4,300 - $3,770
44,960
kWh
$530
-
kW-mo/yr
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $3,150 $500 - - $3,150
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $170 $390 - - $170
-
MMBtu
-
TOTAL RECOMMENDED $136,990 $72,750 $35,020
417,470
kWh
$32,645
-
kW-mo/yr
$69,070
-
MMBtu
$255
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs