ITAC Assessment: AM0545
ITAC logo
ITAC Assessment: AM0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Metal drums
NAICS 332439: Other Metal Container Manufacturing
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 100,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 7,248
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,870 5,496,819
kWh
Electricity Demand $69,775 13,803
kW-mo/yr
Electricity Fees $56,255 -
Natural Gas $620,232 82,986
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $306,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $290,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $68,500 $45,600 $63,500
628,000
kWh
$5,000
-
kW-mo/yr
- - - - -
02 4.212: Adopt in-house material generation $29,390 $77,000 $(-12,400.0)
(-126,800)
kWh
$(-1,010.0)
-
kW-mo/yr
- - - $42,800 -
03 2.8121: Apply for tax-free status for energy purchases $178,620 $5,000 - - - - $35,720 - $142,900
04 2.7145: Install skylights $15,220 $30,900 $15,220
155,500
kWh
- - - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,790 $350 $4,350
44,400
kWh
$440
-
kW-mo/yr
- - - - -
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $4,750 - $4,310
44,040
kWh
$440
-
kW-mo/yr
- - - - -
07 2.4314: Use synthetic lubricant $2,870 - $2,670
27,300
kWh
$200
-
kW-mo/yr
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,230 $325 $290
2,940
kWh
$25
-
kW-mo/yr
- $915 - - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $1,100 $6,700 - - $1,100
-
lb
- - - -
TOTAL RECOMMENDED $306,470 $165,875 $77,940
775,380
kWh
$5,095
-
kW-mo/yr
$1,100
-
lb
$915 $35,720 $42,800 $142,900
TOTAL IMPLEMENTED $290,150 $128,275 $62,720
619,880
kWh
$5,095
-
kW-mo/yr
- $915 $35,720 $42,800 $142,900
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs