Assessment Year | 2008 |
---|---|
Principal Product | PVC Pipe |
NAICS | 326122: Plastics Pipe and Pipe Fitting Manufacturing |
SIC | 3084: Plastics Pipe |
Sales Range | $50 M to 100M |
# of Employees | 100 |
Plant Area |
99,200
ft2
|
Annual Production | 100,000
thousand feet
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,089,866 | 15,117,508 |
kWh
|
$0.072 |
Electricity Demand | $144,127 | 29,603 |
kW-mo/yr
|
$4.87 |
Electricity Fees | $30,809 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,835 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,760 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $26,800 | $4,160 |
$26,800
362,000
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,000 | $230 |
$21,700
294,000
kWh
|
$2,300
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,250 | $1,020 |
$2,100
20,380
kWh
|
$150
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,960 | $822 |
$410
5,560
kWh
|
$40
-
kW-mo/yr
|
$1,510 | |
05 | 2.4314: Use synthetic lubricant | $1,570 | - |
$1,400
19,000
kWh
|
$170
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,255 | $480 |
$1,165
15,740
kWh
|
$90
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $57,835 | $6,712 |
$53,575
716,680
kWh
|
$2,750
-
kW-mo/yr
|
$1,510 | ||
TOTAL IMPLEMENTED | $52,760 | $5,212 |
$48,910
661,560
kWh
|
$2,340
-
kW-mo/yr
|
$1,510 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs