ITAC Assessment: AM0509
ITAC logo
ITAC Assessment: AM0509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Liquid filled transformers
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 55,000
ft2
Annual Production 850
pieces
Production Hrs. Annual 2,150
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,920 345,600
kWh
Electricity Demand $11,631 1,597
kW-mo/yr
Natural Gas $65,837 5,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $2,080 $3,690 - $2,080
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $1,650 $250 - - $1,650
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,010 $913 $690
7,970
kWh
$320
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $560 $250 $380
4,420
kWh
$180
-
kW-mo/yr
-
05 2.7124: Make a practice of turning off lights when not needed $440 - $440
5,100
kWh
- -
TOTAL RECOMMENDED $5,740 $5,103 $1,510
17,490
kWh
$2,580
-
kW-mo/yr
$1,650
-
MMBtu
TOTAL IMPLEMENTED $5,740 $5,103 $1,510
17,490
kWh
$2,580
-
kW-mo/yr
$1,650
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs