ITAC Assessment: AM0508
ITAC logo
ITAC Assessment: AM0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Bottled water and juice
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area 33,000
ft2
Annual Production 600
Tgal
Production Hrs. Annual 1,990
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,994 531,734
kWh
Electricity Demand $9,153 2,900
kW-mo/yr
Natural Gas $7,475 777
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.2121: Increase amount of condensate returned $8,400 $2,190 - - - $6,600
-
MMBtu
- $1,800
-
Tgal
02 4.454: Modify startup/shutdown times $7,024 - - - $7,024 - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,950 $500 $2,410
28,060
kWh
$540
-
kW-mo/yr
- - - -
04 2.6218: Turn off equipment when not in use $2,700 $270 $2,700
31,600
kWh
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $295 $140 $170
1,970
kWh
$37
-
kW-mo/yr
- - $88 -
06 2.7124: Make a practice of turning off lights when not needed $210 $50 $190
2,170
kWh
$20
-
kW-mo/yr
- - - -
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $190 - $190
2,200
kWh
- - - - -
08 2.1233: Analyze flue gas for proper air/fuel ratio $3,980 $500 - - - $3,980
-
MMBtu
- -
TOTAL RECOMMENDED $25,749 $3,650 $5,660
66,000
kWh
$597
-
kW-mo/yr
$7,024 $10,580
-
MMBtu
$88 $1,800
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs