ITAC Assessment: AM0495
ITAC logo
ITAC Assessment: AM0495
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Remanufactured lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 28,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 2,576
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,500 608,400
kWh
Electricity Demand $19,188 4,888
kW-mo/yr
Electricity Fees $1,658 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,426 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.132: Purchase new equipment to reduce material use / cost $138,400 $50,960 - - - $138,400 -
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,300 - - - $6,300
-
lb
- -
03 3.5248: Separate and recycle scrap metal to foundry or for sale $5,940 - - - $5,940
-
lb
- -
04 2.4239: Eliminate or reduce compressed air usage $2,820 $230 $2,180
31,600
kWh
$640
-
kW-mo/yr
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $1,990 - $1,990
28,900
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,250 $200 $1,000
14,500
kWh
$250
-
kW-mo/yr
- - -
07 4.111: Add equipment/ operators to reduce production bottleneck $1,200 $3,750 - - - - $1,200
08 2.7134: Use photocell controls $280 $33 $240
3,450
kWh
$40
-
kW-mo/yr
- - -
09 2.4314: Use synthetic lubricant $246 - $190
2,780
kWh
$56
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $158,426 $55,173 $5,600
81,230
kWh
$986
-
kW-mo/yr
$12,240
-
lb
$138,400 $1,200
TOTAL IMPLEMENTED $19,780 $4,213 $5,410
78,450
kWh
$930
-
kW-mo/yr
$12,240
-
lb
- $1,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs