ITAC Assessment: AM0460
ITAC logo
ITAC Assessment: AM0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Mobile homes and factory-crafted residential homes
NAICS 321991: Manufactured Home (Mobile Home) Manufacturing
SIC 2451: Mobile Homes
Sales Range $5
M
to 10
M
# of Employees 115
Plant Area 120,000
ft2
Annual Production 650
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,226 1,319,192
kWh
Electricity Demand $40,531 8,115
kW-mo/yr
Natural Gas $22,897 2,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $4,110 - $3,100
37,000
kWh
$1,010
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,700 $80 $2,700
48,000
kWh
$1,000
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,600 $1,500 $3,600
63,600
kWh
- - -
04 2.6218: Turn off equipment when not in use $3,340 $825 $3,340
39,310
kWh
- - -
05 2.7124: Make a practice of turning off lights when not needed $780 $580 $280
5,000
kWh
$30
-
kW-mo/yr
- $470
06 2.6212: Turn off equipment during breaks, reduce operating time $650 - $590
10,500
kWh
$60
-
kW-mo/yr
- -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $620 - - - $620
-
lb
-
TOTAL RECOMMENDED $16,800 $2,985 $13,610
203,410
kWh
$2,100
-
kW-mo/yr
$620
-
lb
$470
TOTAL IMPLEMENTED $16,150 $2,985 $13,020
192,910
kWh
$2,040
-
kW-mo/yr
$620
-
lb
$470
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs