ITAC Assessment: AM0435
ITAC logo
ITAC Assessment: AM0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pre-stressing strand and wire
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 44
Plant Area 130,000
ft2
Annual Production 62,000,000
lb
Production Hrs. Annual 6,072
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $908,781 13,410,138
kWh
Natural Gas $147,232 19,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,300 $500 $20,300
390,000
kWh
- -
02 2.4314: Use synthetic lubricant $12,740 - $12,740
212,430
kWh
- -
03 4.211: Consider use / purchase of bulk materials where possible $4,670 - - - $4,670
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,100 - $1,100
18,340
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $950 $235 $170
2,830
kWh
$780 -
06 2.7134: Use photocell controls $775 $75 $775
12,920
kWh
- -
TOTAL RECOMMENDED $40,535 $810 $35,085
636,520
kWh
$780 $4,670
TOTAL IMPLEMENTED $22,175 $575 $22,175
421,260
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs