Assessment Year | 2002 |
---|---|
Principal Product | Coiled tubing |
NAICS | 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel |
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
37,500
ft2
|
Annual Production | 20,000
thousand feet
|
Production Hrs. Annual | 5,540
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $585,195 | 6,679,337 |
kWh
|
$0.088 |
Electricity Demand | $106,414 | 34,447 |
kW-mo/yr
|
$3.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,752,786 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $595,786 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.453: Reschedule breaks to allow for continuous production | $1,157,000 | - | - | - | $1,157,000 | - | - | |
02 | 4.111: Add equipment/ operators to reduce production bottleneck | $243,880 | $16,000 | - | - | $243,880 | - | - | |
03 | 4.111: Add equipment/ operators to reduce production bottleneck | $154,000 | $2,000 | - | - | - | - | $154,000 | |
04 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $110,500 | - | - |
$110,500
-
lb
|
- | - | - | |
05 | 3.6192: Use a less expensive method of waste removal | $42,200 | $700 | - |
$42,200
-
lb
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,700 | $650 |
$29,700
450,000
kWh
|
- | - | - | - | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $13,500 | $16,800 |
$13,500
202,000
kWh
|
- | - | - | - | |
08 | 4.821: Pay bills on time to avoid late fees | $2,006 | - | - | - | - | $2,006 | - | |
TOTAL RECOMMENDED | $1,752,786 | $36,150 |
$43,200
652,000
kWh
|
$152,700
-
lb
|
$1,400,880 | $2,006 | $154,000 | ||
TOTAL IMPLEMENTED | $595,786 | $36,150 |
$43,200
652,000
kWh
|
$152,700
-
lb
|
$243,880 | $2,006 | $154,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs