Assessment Year | 2002 |
---|---|
Principal Product | Heat exchangers |
NAICS |
n/a
|
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 97 |
Plant Area |
110,000
ft2
|
Annual Production | 850
pieces
|
Production Hrs. Annual | 3,012
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $355,220 | 3,638,652 |
kWh
|
$0.098 |
Natural Gas | $26,090 | 1,761 |
MMBtu
|
$14.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,715 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $73,715 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.3122: Use filtration, centrifuging to remove contaminants | $64,320 | $61,000 | - | - | $64,320 | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $2,340 | - | - | - | $2,340 | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,960 | $400 |
$1,960
28,800
kWh
|
- | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $1,810 | $210 |
$1,810
26,800
kWh
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,550 | $1,000 |
$880
13,000
kWh
|
$670
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $860 | $410 |
$250
3,640
kWh
|
$195
-
kW-mo/yr
|
$415 | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $565 | $250 |
$565
8,300
kWh
|
- | - | - | |
08 | 4.821: Pay bills on time to avoid late fees | $310 | - | - | - | - | $310 | |
TOTAL RECOMMENDED | $73,715 | $63,270 |
$5,465
80,540
kWh
|
$865
-
kW-mo/yr
|
$67,075 | $310 | ||
TOTAL IMPLEMENTED | $73,715 | $63,270 |
$5,465
80,540
kWh
|
$865
-
kW-mo/yr
|
$67,075 | $310 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs