ITAC Assessment: AM0416
ITAC logo
ITAC Assessment: AM0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Heat exchangers
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 110,000
ft2
Annual Production 850
pieces
Production Hrs. Annual 3,012
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $355,220 3,638,652
kWh
Natural Gas $26,090 1,761
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 3.3122: Use filtration, centrifuging to remove contaminants $64,320 $61,000 - - $64,320 -
02 4.652: Replace existing equipment with more suitable substitutes $2,340 - - - $2,340 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,960 $400 $1,960
28,800
kWh
- - -
04 2.4239: Eliminate or reduce compressed air usage $1,810 $210 $1,810
26,800
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,550 $1,000 $880
13,000
kWh
$670
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $860 $410 $250
3,640
kWh
$195
-
kW-mo/yr
$415 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $565 $250 $565
8,300
kWh
- - -
08 4.821: Pay bills on time to avoid late fees $310 - - - - $310
TOTAL RECOMMENDED $73,715 $63,270 $5,465
80,540
kWh
$865
-
kW-mo/yr
$67,075 $310
TOTAL IMPLEMENTED $73,715 $63,270 $5,465
80,540
kWh
$865
-
kW-mo/yr
$67,075 $310
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs