ITAC Assessment: AM0411
ITAC logo
ITAC Assessment: AM0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Sand
NAICS
n/a
SIC 1446: Industrial Sand
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area
n/a
Annual Production 750,000
ton
Production Hrs. Annual 7,100
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,485,391 26,189,775
kWh
Electricity Demand $380,919 54,819
kW-mo/yr
Electricity Fees $1,452 -
Natural Gas $276,411 69,060
MMBtu
LPG $731,750 97,832
MMBtu
Fuel Oil #2 $376,492 49,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,800 - - $8,800
-
kW-mo/yr
- -
02 2.8123: Pay utility bills on time $6,350 - - - - $6,350
03 2.4133: Use most efficient type of electric motors $6,140 $33,400 $5,540
72,840
kWh
$600
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $2,680 $340 $1,840
34,050
kWh
$840
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,190 $560 $1,070
14,100
kWh
$120
-
kW-mo/yr
- -
06 3.6192: Use a less expensive method of waste removal $1,440 $600 - - $1,440 -
07 2.7124: Make a practice of turning off lights when not needed $1,140 - $950
12,500
kWh
$190
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,070 $205 $460
6,060
kWh
$35
-
kW-mo/yr
$575 -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $580 $260 $580
7,160
kWh
- - -
10 2.7111: Reduce illumination to minimum necessary levels $150 - $150
1,915
kWh
- - -
TOTAL RECOMMENDED $29,540 $35,365 $10,590
148,625
kWh
$10,585
-
kW-mo/yr
$2,015 $6,350
TOTAL IMPLEMENTED $29,540 $35,365 $10,590
148,625
kWh
$10,585
-
kW-mo/yr
$2,015 $6,350
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs