| Assessment Year | 2002 |
|---|---|
| Principal Product | Sand |
| NAICS |
n/a
|
| SIC | 1446: Industrial Sand |
| Sales Range | $10 M to 50M |
| # of Employees | 77 |
| Plant Area |
n/a
|
| Annual Production | 750,000
ton
|
| Production Hrs. Annual | 7,100
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,485,391 | 26,189,775 |
kWh
|
$0.057 |
| Electricity Demand | $380,919 | 54,819 |
kW-mo/yr
|
$6.95 |
| Electricity Fees | $1,452 | - |
|
- |
| Natural Gas | $276,411 | 69,060 |
MMBtu
|
$4.00 |
| LPG | $731,750 | 97,832 |
MMBtu
|
$7.48 |
| Fuel Oil #2 | $376,492 | 49,234 |
MMBtu
|
$7.65 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,540 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,800 | - | - |
$8,800
-
kW-mo/yr
|
- | - | |
| 02 | 2.8123: Pay utility bills on time | $6,350 | - | - | - | - | $6,350 | |
| 03 | 2.4133: Use most efficient type of electric motors | $6,140 | $33,400 |
$5,540
72,840
kWh
|
$600
-
kW-mo/yr
|
- | - | |
| 04 | 2.7124: Make a practice of turning off lights when not needed | $2,680 | $340 |
$1,840
34,050
kWh
|
$840
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,190 | $560 |
$1,070
14,100
kWh
|
$120
-
kW-mo/yr
|
- | - | |
| 06 | 3.6192: Use a less expensive method of waste removal | $1,440 | $600 | - | - | $1,440 | - | |
| 07 | 2.7124: Make a practice of turning off lights when not needed | $1,140 | - |
$950
12,500
kWh
|
$190
-
kW-mo/yr
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,070 | $205 |
$460
6,060
kWh
|
$35
-
kW-mo/yr
|
$575 | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $580 | $260 |
$580
7,160
kWh
|
- | - | - | |
| 10 | 2.7111: Reduce illumination to minimum necessary levels | $150 | - |
$150
1,915
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $29,540 | $35,365 |
$10,590
148,625
kWh
|
$10,585
-
kW-mo/yr
|
$2,015 | $6,350 | ||
| TOTAL IMPLEMENTED | $29,540 | $35,365 |
$10,590
148,625
kWh
|
$10,585
-
kW-mo/yr
|
$2,015 | $6,350 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs