Assessment Year | 2002 |
---|---|
Principal Product | Sand |
NAICS |
n/a
|
SIC | 1446: Industrial Sand |
Sales Range | $10 M to 50M |
# of Employees | 77 |
Plant Area |
n/a
|
Annual Production | 750,000
ton
|
Production Hrs. Annual | 7,100
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,485,391 | 26,189,775 |
kWh
|
$0.057 |
Electricity Demand | $380,919 | 54,819 |
kW-mo/yr
|
$6.95 |
Electricity Fees | $1,452 | - |
|
- |
Natural Gas | $276,411 | 69,060 |
MMBtu
|
$4.00 |
LPG | $731,750 | 97,832 |
MMBtu
|
$7.48 |
Fuel Oil #2 | $376,492 | 49,234 |
MMBtu
|
$7.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,540 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,540 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,800 | - | - |
$8,800
-
kW-mo/yr
|
- | - | |
02 | 2.8123: Pay utility bills on time | $6,350 | - | - | - | - | $6,350 | |
03 | 2.4133: Use most efficient type of electric motors | $6,140 | $33,400 |
$5,540
72,840
kWh
|
$600
-
kW-mo/yr
|
- | - | |
04 | 2.7124: Make a practice of turning off lights when not needed | $2,680 | $340 |
$1,840
34,050
kWh
|
$840
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,190 | $560 |
$1,070
14,100
kWh
|
$120
-
kW-mo/yr
|
- | - | |
06 | 3.6192: Use a less expensive method of waste removal | $1,440 | $600 | - | - | $1,440 | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $1,140 | - |
$950
12,500
kWh
|
$190
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,070 | $205 |
$460
6,060
kWh
|
$35
-
kW-mo/yr
|
$575 | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $580 | $260 |
$580
7,160
kWh
|
- | - | - | |
10 | 2.7111: Reduce illumination to minimum necessary levels | $150 | - |
$150
1,915
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $29,540 | $35,365 |
$10,590
148,625
kWh
|
$10,585
-
kW-mo/yr
|
$2,015 | $6,350 | ||
TOTAL IMPLEMENTED | $29,540 | $35,365 |
$10,590
148,625
kWh
|
$10,585
-
kW-mo/yr
|
$2,015 | $6,350 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs