| Assessment Year | 2002 |
|---|---|
| Principal Product | Plastic cups, containers,lids |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
64,000
ft2
|
| Annual Production | 200,000,000
pieces
|
| Production Hrs. Annual | 8,520
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $395,984 | 11,685,825 |
kWh
|
$0.034 |
| Electricity Demand | $165,225 | 20,078 |
kW-mo/yr
|
$8.23 |
| Electricity Fees | $165 | - |
|
- |
| Natural Gas | $4,256 | 699 |
MMBtu
|
$6.09 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $137,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,890 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.513: Re-arrange equipment layout to reduce labor costs | $74,250 | $400,000 | n/a | - | - | $37,650 | $36,600 |
| 02 | 4.122: Develop standard procedures to improve internal yields | $52,500 | - | - | - | - | $52,500 | |
| 03 | 2.2511: Insulate bare equipment | $7,300 | $700 |
$7,300
182,600
kWh
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,330 | $400 |
$2,330
58,180
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $280 | $720 |
$200
4,900
kWh
|
$80
-
kW-mo/yr
|
- | - | |
| 06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $560 | - |
$560
14,150
kWh
|
- | - | - | |
| 07 | 2.2511: Insulate bare equipment | $410 | $660 |
$410
10,170
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $137,630 | $402,480 |
$10,800
270,000
kWh
|
$80
-
kW-mo/yr
|
$37,650 | $89,100 | ||
| TOTAL IMPLEMENTED | $2,890 | $400 |
$2,890
72,330
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs