ITAC Assessment: AM0401
ITAC logo
ITAC Assessment: AM0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Petroleum refining
NAICS
n/a
SIC 2911: Petroleum Refining
Sales Range greater than $500
M
# of Employees 130
Plant Area
n/a
Annual Production 382,200
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $963,738 47,952,000
kWh
Electricity Demand $421,700 73,853
kW-mo/yr
Electricity Fees $(-42,988.0) -
Natural Gas $4,546,124 916,433
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $327,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $209,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.2113: Repair or replace steam traps $147,000 $800 - - $147,000
-
MMBtu
-
02 2.4314: Use synthetic lubricant $76,500 - $73,600
3,346,700
kWh
$2,900
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $46,800 $1,400 - - $46,800
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $27,020 $119,000 n/a $18,950
861,200
kWh
$8,070
-
kW-mo/yr
- -
05 2.3212: Optimize plant power factor $13,200 $28,000 n/a - $13,200
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,300 - - $12,300
-
kW-mo/yr
- -
07 2.2135: Repair and eliminate steam leaks $3,400 $1,000 - - $3,400
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,170 $700 $125
5,660
kWh
$50
-
kW-mo/yr
- $995
TOTAL RECOMMENDED $327,390 $150,900 $92,675
4,213,560
kWh
$36,520
-
kW-mo/yr
$197,200
-
MMBtu
$995
TOTAL IMPLEMENTED $209,500 $3,200 - $12,300
-
kW-mo/yr
$197,200
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings