Assessment Year | 2001 |
---|---|
Principal Product | Petroleum refining |
NAICS |
n/a
|
SIC | 2911: Petroleum Refining |
Sales Range | greater than $500 M |
# of Employees | 130 |
Plant Area |
n/a
|
Annual Production | 382,200
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $963,738 | 47,952,000 |
kWh
|
$0.020 |
Electricity Demand | $421,700 | 73,853 |
kW-mo/yr
|
$5.71 |
Electricity Fees | $(-42,988.0) | - |
|
- |
Natural Gas | $4,546,124 | 916,433 |
MMBtu
|
$4.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $327,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $209,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2113: Repair or replace steam traps | $147,000 | $800 | - | - |
$147,000
-
MMBtu
|
- | |
02 | 2.4314: Use synthetic lubricant | $76,500 | - |
$73,600
3,346,700
kWh
|
$2,900
-
kW-mo/yr
|
- | - | |
03 | 2.2511: Insulate bare equipment | $46,800 | $1,400 | - | - |
$46,800
-
MMBtu
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $27,020 | $119,000 | n/a |
$18,950
861,200
kWh
|
$8,070
-
kW-mo/yr
|
- | - |
05 | 2.3212: Optimize plant power factor | $13,200 | $28,000 | n/a | - |
$13,200
-
kW-mo/yr
|
- | - |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $12,300 | - | - |
$12,300
-
kW-mo/yr
|
- | - | |
07 | 2.2135: Repair and eliminate steam leaks | $3,400 | $1,000 | - | - |
$3,400
-
MMBtu
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,170 | $700 |
$125
5,660
kWh
|
$50
-
kW-mo/yr
|
- | $995 | |
TOTAL RECOMMENDED | $327,390 | $150,900 |
$92,675
4,213,560
kWh
|
$36,520
-
kW-mo/yr
|
$197,200
-
MMBtu
|
$995 | ||
TOTAL IMPLEMENTED | $209,500 | $3,200 | - |
$12,300
-
kW-mo/yr
|
$197,200
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs