ITAC Assessment: AM0395
ITAC logo
ITAC Assessment: AM0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Springs
NAICS
n/a
SIC 3493: Steel Springs, Except Wire
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 80,000
ft2
Annual Production 19,200
pieces
Production Hrs. Annual 3,336
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,461 1,245,600
kWh
Electricity Demand $15,785 5,212
kW-mo/yr
Natural Gas $117,138 19,312
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,785 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,275

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $9,370 $14,460 - $9,370
-
kW-mo/yr
- -
02 2.7145: Install skylights $5,430 $11,800 $5,430
77,600
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $875 $580 $205
2,940
kWh
$20
-
kW-mo/yr
- $650
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,180 $1,140 $920
13,190
kWh
$260
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $1,080 $100 $1,080
15,390
kWh
- - -
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $710 $703 - - $710
-
MMBtu
-
07 2.7124: Make a practice of turning off lights when not needed $870 $445 $870
12,430
kWh
- - -
08 2.7123: Keep lamps and reflectors clean $270 $750 $210
2,960
kWh
$60
-
kW-mo/yr
- -
TOTAL RECOMMENDED $19,785 $29,978 $8,715
124,510
kWh
$9,710
-
kW-mo/yr
$710
-
MMBtu
$650
TOTAL IMPLEMENTED $4,275 $3,015 $3,285
46,910
kWh
$340
-
kW-mo/yr
- $650
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings