ITAC Assessment: UF0546
ITAC logo
ITAC Assessment: UF0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Chemical Compounds
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 152,460
ft2
Annual Production 8
ton
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,277 1,145,005
kWh
Electricity Demand $24,434 2,284
kW-mo/yr
Electricity Fees $18,510 -
TOTAL YEARLY COSTS $124,221
RECOMMENDED SAVINGS* $63,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,967

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $40,475 $333,760 $40,475
570,064
kWh
-
02 2.4133: Use most efficient type of electric motors $14,436 $15,494 $11,934
168,092
kWh
$2,502
-
kW-mo/yr
03 2.4112: Install soft-start to eliminate nuisance trips $5,492 $4,295 $5,492
77,345
kWh
-
04 2.7135: Install occupancy sensors $2,226 $10,638 $2,226
31,346
kWh
-
05 2.6212: Turn off equipment during breaks, reduce operating time $1,023 $60 $1,023
14,414
kWh
-
TOTAL RECOMMENDED $63,652 $364,247 $61,150
861,261
kWh
$2,502
-
kW-mo/yr
TOTAL IMPLEMENTED $45,967 $338,055 $45,967
647,409
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs