Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Oil & Water Well Screens
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 262
thousand feet
Production Hrs. Annual 0
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,040 1,529,050
kWh
Electricity Demand $15,973 5,512
kW-mo/yr
Natural Gas $29,800 5,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,145 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,625

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $15,625 $1,250 $15,625
258,300
kWh
- - - -
02 2.3212: Optimize plant power factor $4,760 $4,500 - $4,760
-
kW-mo/yr
- - -
03 3.3131: Use evaporation to concentrate material $4,480 $7,000 - - - $4,480
-
Tgal
-
04 2.7145: Install skylights $3,400 $9,860 $3,400
67,700
kWh
- - - -
05 2.4133: Use most efficient type of electric motors $3,340 $5,705 $2,610
40,685
kWh
$730
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $2,450 $4,330 - $2,450
-
kW-mo/yr
- - -
07 2.6218: Turn off equipment when not in use $2,300 - $2,300
32,300
kWh
- - - -
08 2.7124: Make a practice of turning off lights when not needed $2,280 - $2,280
32,060
kWh
- - - -
09 2.1121: Use insulation in furnaces to facilitate heating / cooling $1,640 $240 - - $1,640
-
MMBtu
- -
10 2.6218: Turn off equipment when not in use $1,250 - - - $1,250
-
MMBtu
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,220 $2,000 $1,070
15,000
kWh
$150
-
kW-mo/yr
- - -
12 2.7145: Install skylights $1,000 $3,170 $1,000
14,100
kWh
- - - -
13 4.821: Pay bills on time to avoid late fees $975 - - - - - $975
14 2.4314: Use synthetic lubricant $655 - $530
7,880
kWh
$125
-
kW-mo/yr
- - -
15 2.3212: Optimize plant power factor $395 $1,875 - $395
-
kW-mo/yr
- - -
16 2.7134: Use photocell controls $375 - $260
3,360
kWh
$115
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $46,145 $39,930 $29,075
471,385
kWh
$8,725
-
kW-mo/yr
$2,890
-
MMBtu
$4,480
-
Tgal
$975
TOTAL IMPLEMENTED $30,625 $13,955 $23,075
366,705
kWh
$845
-
kW-mo/yr
$1,250
-
MMBtu
$4,480
-
Tgal
$975
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs