Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Treated lumber & plywood
NAICS
n/a
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 37
Plant Area
n/a
Annual Production 61,000
thousand feet
Production Hrs. Annual 2,873
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,866 960,733
kWh
Natural Gas $104,199 17,554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $4,590 $5,320 - $4,590
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $2,180 $4,750 - $2,180
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $2,350 $330 - - $2,350
-
MMBtu
-
04 3.5248: Separate and recycle scrap metal to foundry or for sale $690 - - - - $690
-
lb
05 2.7142: Utilize higher efficiency lamps and/or ballasts $350 $245 $260
3,700
kWh
$90
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $230 $100 $230
3,200
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $110 $20 $80
1,150
kWh
$30
-
kW-mo/yr
- -
08 2.7134: Use photocell controls $100 - $65
1,100
kWh
$35
-
kW-mo/yr
- -
TOTAL RECOMMENDED $10,600 $10,765 $635
9,150
kWh
$6,925
-
kW-mo/yr
$2,350
-
MMBtu
$690
-
lb
TOTAL IMPLEMENTED $2,680 $430 $295
4,300
kWh
$35
-
kW-mo/yr
$2,350
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs