Assessment Year | 2000 |
---|---|
Principal Product | Steel pipe for oil and gas industry |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
150,000
ft2
|
Annual Production | 514,000
pieces
|
Production Hrs. Annual | 6,024
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $230,000 | 3,677,608 |
kWh
|
$0.063 |
Electricity Demand | $63,000 | 20,500 |
kW-mo/yr
|
$3.07 |
Natural Gas | $149,200 | 43,701 |
MMBtu
|
$3.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,780 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $91,292 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $21,982 | $6,500 | - | - | - | - | - | - | $21,982 | - | |
02 | 2.3212: Optimize plant power factor | $18,650 | $39,500 | - |
$18,650
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,660 | $500 |
$13,660
262,603
kWh
|
- | - | - | - | - | - | - | |
04 | 3.8136: Switch to a solvent that can be cleaned and re-used | $13,630 | $699 | - | - | - | - |
$13,630
-
lb
|
- | - | - | |
05 | 2.5111: Convert from indirect to direct fired systems | $11,000 | $1,350 | - | - |
$11,000
-
MMBtu
|
- | - | - | - | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $9,638 | - | - | - | - | - | - | - | $9,638 | - | |
07 | 4.122: Develop standard procedures to improve internal yields | $4,000 | - | - | - | - | - | - | - | - | $4,000 | |
08 | 3.6194: Ship hydraulic oil to secondary fuel program | $3,610 | - | - | - | - |
$3,610
-
gal
|
- | - | - | - | |
09 | 4.821: Pay bills on time to avoid late fees | $2,450 | - | - | - | - | - | - | $2,450 | - | - | |
10 | 2.7111: Reduce illumination to minimum necessary levels | $2,390 | - |
$1,710
32,825
kWh
|
$680
-
kW-mo/yr
|
- | - | - | - | - | - | |
11 | 2.7144: Install spectral reflectors / delamp | $2,310 | $2,800 |
$1,890
36,342
kWh
|
$420
-
kW-mo/yr
|
- | - | - | - | - | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $460 | $250 |
$90
1,758
kWh
|
$10
-
kW-mo/yr
|
- | - | - | $360 | - | - | |
TOTAL RECOMMENDED | $103,780 | $51,599 |
$17,350
333,528
kWh
|
$19,760
-
kW-mo/yr
|
$11,000
-
MMBtu
|
$3,610
-
gal
|
$13,630
-
lb
|
$2,810 | $31,620 | $4,000 | ||
TOTAL IMPLEMENTED | $91,292 | $51,349 |
$15,550
298,945
kWh
|
$19,070
-
kW-mo/yr
|
$11,000
-
MMBtu
|
$3,610
-
gal
|
$13,630
-
lb
|
$2,450 | $21,982 | $4,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs