Assessment Year | 2000 |
---|---|
Principal Product | Oil drilling equipment |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
120,000
ft2
|
Annual Production | 45,020
pieces
|
Production Hrs. Annual | 3,218
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,923 | 2,286,635 |
kWh
|
$0.048 |
Electricity Demand | $22,039 | 5,651 |
kW-mo/yr
|
$3.90 |
Natural Gas | $7,845 | 2,227 |
MMBtu
|
$3.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,560 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $27,190 | - | - | - |
$13,440
-
gal
|
$13,750 | - | |
02 | 4.131: Modify process to reduce material use/cost | $11,500 | $6,100 | - | - | - | - | $11,500 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,870 | $500 |
$4,870
92,028
kWh
|
- | - | - | - | |
04 | 4.131: Modify process to reduce material use/cost | $900 | $1,000 | - | - | - | - | $900 | |
05 | 2.7135: Install occupancy sensors | $450 | $110 |
$450
8,499
kWh
|
- | - | - | - | |
06 | 2.6242: Minimize operation of equipment maintained in standby condition | $320 | - |
$290
5,569
kWh
|
$30
-
kW-mo/yr
|
- | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $230 | - |
$230
4,396
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $45,460 | $7,710 |
$5,840
110,492
kWh
|
$30
-
kW-mo/yr
|
$13,440
-
gal
|
$13,750 | $12,400 | ||
TOTAL IMPLEMENTED | $44,560 | $6,710 |
$5,840
110,492
kWh
|
$30
-
kW-mo/yr
|
$13,440
-
gal
|
$13,750 | $11,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs