ITAC Assessment: AM0377
ITAC logo
ITAC Assessment: AM0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Oil drilling equipment
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 120,000
ft2
Annual Production 45,020
pieces
Production Hrs. Annual 3,218
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,923 2,286,635
kWh
Electricity Demand $22,039 5,651
kW-mo/yr
Natural Gas $7,845 2,227
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $27,190 - - - $13,440
-
gal
$13,750 -
02 4.131: Modify process to reduce material use/cost $11,500 $6,100 - - - - $11,500
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,870 $500 $4,870
92,028
kWh
- - - -
04 4.131: Modify process to reduce material use/cost $900 $1,000 - - - - $900
05 2.7135: Install occupancy sensors $450 $110 $450
8,499
kWh
- - - -
06 2.6242: Minimize operation of equipment maintained in standby condition $320 - $290
5,569
kWh
$30
-
kW-mo/yr
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $230 - $230
4,396
kWh
- - - -
TOTAL RECOMMENDED $45,460 $7,710 $5,840
110,492
kWh
$30
-
kW-mo/yr
$13,440
-
gal
$13,750 $12,400
TOTAL IMPLEMENTED $44,560 $6,710 $5,840
110,492
kWh
$30
-
kW-mo/yr
$13,440
-
gal
$13,750 $11,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs