Assessment Year | 2000 |
---|---|
Principal Product | Milk products |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 240 |
Plant Area |
120,000
ft2
|
Annual Production | 30,000
Tgal
|
Production Hrs. Annual | 6,816
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $346,302 | 14,045,135 |
kWh
|
$0.025 |
Electricity Demand | $172,466 | 23,986 |
kW-mo/yr
|
$7.19 |
Natural Gas | $75,502 | 22,087 |
MMBtu
|
$3.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,605 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,545 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.4151: Minimize water usage | $13,250 | $3,170 | - | - | - |
$13,250
-
Tgal
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,590 | $500 | - | - |
$6,590
-
MMBtu
|
- | - | |
03 | 2.3212: Optimize plant power factor | $5,500 | $10,990 | - |
$5,500
-
kW-mo/yr
|
- | - | - | |
04 | 3.4154: Eliminate leaks in water lines and valves | $2,180 | $300 | - | - | - |
$2,180
-
Tgal
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,390 | $720 |
$225
6,741
kWh
|
$65
-
kW-mo/yr
|
- | - | $1,100 | |
06 | 2.3132: Recharge batteries on during off-peak demand periods | $1,060 | - | - |
$1,060
-
kW-mo/yr
|
- | - | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $835 | - |
$490
14,361
kWh
|
$345
-
kW-mo/yr
|
- | - | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $500 | $1,060 |
$500
14,654
kWh
|
- | - | - | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $300 | - |
$300
9,086
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $31,605 | $16,740 |
$1,515
44,842
kWh
|
$6,970
-
kW-mo/yr
|
$6,590
-
MMBtu
|
$15,430
-
Tgal
|
$1,100 | ||
TOTAL IMPLEMENTED | $30,545 | $16,740 |
$1,515
44,842
kWh
|
$5,910
-
kW-mo/yr
|
$6,590
-
MMBtu
|
$15,430
-
Tgal
|
$1,100 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs