ITAC Assessment: AM0375
ITAC logo
ITAC Assessment: AM0375
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Milk products
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 120,000
ft2
Annual Production 30,000
Tgal
Production Hrs. Annual 6,816
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $346,302 14,045,135
kWh
Electricity Demand $172,466 23,986
kW-mo/yr
Natural Gas $75,502 22,087
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 3.4151: Minimize water usage $13,250 $3,170 - - - $13,250
-
Tgal
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,590 $500 - - $6,590
-
MMBtu
- -
03 2.3212: Optimize plant power factor $5,500 $10,990 - $5,500
-
kW-mo/yr
- - -
04 3.4154: Eliminate leaks in water lines and valves $2,180 $300 - - - $2,180
-
Tgal
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,390 $720 $225
6,741
kWh
$65
-
kW-mo/yr
- - $1,100
06 2.3132: Recharge batteries on during off-peak demand periods $1,060 - - $1,060
-
kW-mo/yr
- - -
07 2.7124: Make a practice of turning off lights when not needed $835 - $490
14,361
kWh
$345
-
kW-mo/yr
- - -
08 2.4239: Eliminate or reduce compressed air usage $500 $1,060 $500
14,654
kWh
- - - -
09 2.6212: Turn off equipment during breaks, reduce operating time $300 - $300
9,086
kWh
- - - -
TOTAL RECOMMENDED $31,605 $16,740 $1,515
44,842
kWh
$6,970
-
kW-mo/yr
$6,590
-
MMBtu
$15,430
-
Tgal
$1,100
TOTAL IMPLEMENTED $30,545 $16,740 $1,515
44,842
kWh
$5,910
-
kW-mo/yr
$6,590
-
MMBtu
$15,430
-
Tgal
$1,100
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs