Assessment Year | 2000 |
---|---|
Principal Product | high density polyethylene barrels and containers |
NAICS |
n/a
|
SIC | 3432: Plumbing Fixture Fittings and Trim |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
90,000
ft2
|
Annual Production | 6,000,000
pieces
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $304,608 | 8,492,087 |
kWh
|
$0.036 |
Electricity Demand | $143,505 | 20,458 |
kW-mo/yr
|
$7.01 |
Natural Gas | $1,419 | 295 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,502 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,262 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $6,100 | - |
$3,650
126,026
kWh
|
$2,450
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,700 | $500 |
$5,700
196,366
kWh
|
- | - | - | |
03 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $3,850 | - | - | - | - | $3,850 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,065 | $210 |
$2,260
77,960
kWh
|
$805
-
kW-mo/yr
|
- | - | |
05 | 3.6192: Use a less expensive method of waste removal | $2,592 | $150 | - | - |
$2,592
-
lb
|
- | |
06 | 2.7145: Install skylights | $1,300 | $5,520 |
$1,300
45,135
kWh
|
- | - | - | |
07 | 2.2515: Use optimum thickness insulation | $940 | $734 |
$690
24,033
kWh
|
$250
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $585 | - |
$435
14,947
kWh
|
$150
-
kW-mo/yr
|
- | - | |
09 | 2.7124: Make a practice of turning off lights when not needed | $585 | - |
$585
20,223
kWh
|
- | - | - | |
10 | 2.7135: Install occupancy sensors | $470 | $210 |
$470
16,413
kWh
|
- | - | - | |
11 | 3.7212: Improved material handling (mixing and transfer) | $315 | - | - | - |
$315
-
lb
|
- | |
TOTAL RECOMMENDED | $25,502 | $7,324 |
$15,090
521,103
kWh
|
$3,655
-
kW-mo/yr
|
$2,907
-
lb
|
$3,850 | ||
TOTAL IMPLEMENTED | $23,262 | $1,070 |
$13,100
451,935
kWh
|
$3,405
-
kW-mo/yr
|
$2,907
-
lb
|
$3,850 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs