ITAC Assessment: AM0365
ITAC logo
ITAC Assessment: AM0365
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Clay bricks
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 104,850
ft2
Annual Production 33,000,000
pieces
Production Hrs. Annual 8,670
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,761 2,530,774
kWh
Electricity Demand $37,138 4,846
kW-mo/yr
Natural Gas $380,679 146,532
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $4,070 $2,740 - - $4,070
-
MMBtu
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,090 $8 $360
14,068
kWh
$730
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $950 $850 $200
7,913
kWh
$440
-
kW-mo/yr
- - - $310
04 3.5212: Regrind, reuse, or sell scrap plastic parts $930 $200 - - - - $930
-
lb
-
05 3.8132: Use less toxic and volatile solvent substitutes $875 $1,030 - - - $875
-
gal
- -
06 2.7124: Make a practice of turning off lights when not needed $660 - $230
8,792
kWh
$430
-
kW-mo/yr
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $260 $100 $260
9,965
kWh
- - - - -
08 2.7124: Make a practice of turning off lights when not needed $120 - $180
6,448
kWh
- - - - $(-60.0)
TOTAL RECOMMENDED $8,955 $4,928 $1,230
47,186
kWh
$1,600
-
kW-mo/yr
$4,070
-
MMBtu
$875
-
gal
$930
-
lb
$250
TOTAL IMPLEMENTED $7,150 $3,698 $1,230
47,186
kWh
$1,600
-
kW-mo/yr
$4,070
-
MMBtu
- - $250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs