| Assessment Year | 2000 |
|---|---|
| Principal Product | Refrigeration and other control valves |
| NAICS |
n/a
|
| SIC | 3491: Industrial Valves |
| Sales Range | $10 M to 50M |
| # of Employees | 215 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,750,000
lb
|
| Production Hrs. Annual | 5,072
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $91,765 | 1,987,397 |
kWh
|
$0.046 |
| Electricity Demand | $17,641 | 5,428 |
kW-mo/yr
|
$3.25 |
| Natural Gas | $6,019 | 1,439 |
MMBtu
|
$4.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,535 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,255 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.7191: Use water based spray abrasives instead of bar abrasives | $13,500 | $70,000 | - | - |
$13,500
-
gal
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,540 | $500 |
$4,540
105,510
kWh
|
- | - | - | |
| 03 | 2.2511: Insulate bare equipment | $1,245 | $210 |
$1,000
23,154
kWh
|
$245
-
kW-mo/yr
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $600 | $180 |
$600
13,775
kWh
|
- | - | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $470 | $215 |
$60
1,465
kWh
|
$10
-
kW-mo/yr
|
- | $400 | |
| 06 | 2.4314: Use synthetic lubricant | $180 | - |
$145
3,224
kWh
|
$35
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $20,535 | $71,105 |
$6,345
147,128
kWh
|
$290
-
kW-mo/yr
|
$13,500
-
gal
|
$400 | ||
| TOTAL IMPLEMENTED | $6,255 | $925 |
$5,600
130,129
kWh
|
$255
-
kW-mo/yr
|
- | $400 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs