Assessment Year | 1999 |
---|---|
Principal Product | process vessels, fabricated pipe |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
240,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 2,702
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $86,025 | 1,687,866 |
kWh
|
$0.051 |
Electricity Demand | $62,836 | 8,191 |
kW-mo/yr
|
$7.67 |
Natural Gas | $51,649 | 12,569 |
MMBtu
|
$4.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,200 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,200 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $13,800 | $12,800 | - | - |
$13,800
-
MMBtu
|
|
02 | 2.7124: Make a practice of turning off lights when not needed | $2,360 | - |
$1,180
28,722
kWh
|
$1,180
-
kW-mo/yr
|
- | |
03 | 2.7124: Make a practice of turning off lights when not needed | $1,140 | - |
$1,140
27,843
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,100 | $500 |
$1,100
26,964
kWh
|
- | - | |
05 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,090 | - |
$1,090
26,671
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $420 | $200 |
$420
10,258
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $190 | $110 |
$190
4,689
kWh
|
- | - | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $100 | - |
$100
586
kWh
|
- | - | |
TOTAL RECOMMENDED | $20,200 | $13,610 |
$5,220
125,733
kWh
|
$1,180
-
kW-mo/yr
|
$13,800
-
MMBtu
|
||
TOTAL IMPLEMENTED | $20,200 | $13,610 |
$5,220
125,733
kWh
|
$1,180
-
kW-mo/yr
|
$13,800
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs