ITAC Assessment: AM0357
ITAC logo
ITAC Assessment: AM0357
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Brass tubular plumbing supplies, Plastic tubular plumbing su
NAICS
n/a
SIC 3432: Plumbing Fixture Fittings and Trim
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 140,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,528
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,414 4,172,919
kWh
Electricity Demand $91,958 11,348
kW-mo/yr
Natural Gas $39,982 12,453
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $302,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $255,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 4.621: Use fixtures to reduce machine changeout times $250,000 $285,000 - - - $250,000
02 3.4113: Treat and reuse rinse waters $45,000 $1,200 - - $45,000
-
Tgal
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,500 $30 $1,880
72,392
kWh
$1,620
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $1,830 $600 $1,830
70,633
kWh
- - -
05 4.821: Pay bills on time to avoid late fees $1,000 - - - - $1,000
06 2.7142: Utilize higher efficiency lamps and/or ballasts $640 $500 $90
3,517
kWh
$50
-
kW-mo/yr
- $500
07 2.7124: Make a practice of turning off lights when not needed $460 $400 $460
17,585
kWh
- - -
08 2.7135: Install occupancy sensors $330 $150 $330
12,603
kWh
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $150 $150 $150
5,569
kWh
- - -
TOTAL RECOMMENDED $302,910 $288,030 $4,740
182,299
kWh
$1,670
-
kW-mo/yr
$45,000
-
Tgal
$251,500
TOTAL IMPLEMENTED $255,620 $285,830 $2,450
94,081
kWh
$1,670
-
kW-mo/yr
- $251,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs