| Assessment Year | 1999 |
|---|---|
| Principal Product | Brass tubular plumbing supplies, Plastic tubular plumbing su |
| NAICS |
n/a
|
| SIC | 3432: Plumbing Fixture Fittings and Trim |
| Sales Range | $10 M to 50M |
| # of Employees | 115 |
| Plant Area |
140,000
ft2
|
| Annual Production | 3,000,000
pieces
|
| Production Hrs. Annual | 6,528
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $153,414 | 4,172,919 |
kWh
|
$0.037 |
| Electricity Demand | $91,958 | 11,348 |
kW-mo/yr
|
$8.10 |
| Natural Gas | $39,982 | 12,453 |
MMBtu
|
$3.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $302,910 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $255,620 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.621: Use fixtures to reduce machine changeout times | $250,000 | $285,000 | - | - | - | $250,000 | |
| 02 | 3.4113: Treat and reuse rinse waters | $45,000 | $1,200 | - | - |
$45,000
-
Tgal
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,500 | $30 |
$1,880
72,392
kWh
|
$1,620
-
kW-mo/yr
|
- | - | |
| 04 | 2.7124: Make a practice of turning off lights when not needed | $1,830 | $600 |
$1,830
70,633
kWh
|
- | - | - | |
| 05 | 4.821: Pay bills on time to avoid late fees | $1,000 | - | - | - | - | $1,000 | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $640 | $500 |
$90
3,517
kWh
|
$50
-
kW-mo/yr
|
- | $500 | |
| 07 | 2.7124: Make a practice of turning off lights when not needed | $460 | $400 |
$460
17,585
kWh
|
- | - | - | |
| 08 | 2.7135: Install occupancy sensors | $330 | $150 |
$330
12,603
kWh
|
- | - | - | |
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $150 | $150 |
$150
5,569
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $302,910 | $288,030 |
$4,740
182,299
kWh
|
$1,670
-
kW-mo/yr
|
$45,000
-
Tgal
|
$251,500 | ||
| TOTAL IMPLEMENTED | $255,620 | $285,830 |
$2,450
94,081
kWh
|
$1,670
-
kW-mo/yr
|
- | $251,500 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs