ITAC Assessment: TT0139
ITAC logo
ITAC Assessment: TT0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Aircraft landing gear
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 251
Plant Area 300,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 8,640
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,139,735 19,393,200
kWh
Electricity Demand $392,555 33,387
kW-mo/yr
Electricity Fees $(-59,380.0) -
Natural Gas $82,516 10,606
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,740

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $117 $126 - - $117
-
MMBtu
02 2.7122: Disconnect ballasts $280 $100 $220
3,723
kWh
$60
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $13,460 $500 $13,460
182,207
kWh
- -
04 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $76,287 $2,900 $58,034
983,626
kWh
$18,253
-
kW-mo/yr
-
TOTAL RECOMMENDED $90,144 $3,626 $71,714
1,169,556
kWh
$18,313
-
kW-mo/yr
$117
-
MMBtu
TOTAL IMPLEMENTED $13,740 $600 $13,680
185,930
kWh
$60
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs