ITAC Assessment: AM0351
ITAC logo
ITAC Assessment: AM0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic insulated beverage containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 160,000
ft2
Annual Production 42,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,532 6,391,266
kWh
Electricity Demand $118,836 14,630
kW-mo/yr
Electricity Fees $6,090 -
Natural Gas $9,782 2,080
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,844,725 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings Increase in Production Savings
01 4.122: Develop standard procedures to improve internal yields $1,734,000 - n/a - - - - - - $1,734,000
02 4.122: Develop standard procedures to improve internal yields $95,090 $7,400 n/a - - - - $5,940 $89,150 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,730 $1,225 n/a $8,730
334,408
kWh
- - - - - -
04 2.7111: Reduce illumination to minimum necessary levels $2,970 $820 n/a $1,040
39,566
kWh
$1,930
-
kW-mo/yr
- - - - -
05 4.821: Pay bills on time to avoid late fees $2,790 - n/a - - - $2,790 - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $585 $860 n/a $155
5,862
kWh
$100
-
kW-mo/yr
$330 - - - -
07 2.3137: Use power during off-peak periods $560 - n/a - $560
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $1,844,725 $10,305 $9,925
379,836
kWh
$2,590
-
kW-mo/yr
$330 $2,790 $5,940 $89,150 $1,734,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs