| Assessment Year | 1999 |
|---|---|
| Principal Product | steel tubing |
| NAICS |
n/a
|
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
50,000
ft2
|
| Annual Production | 51,000
thousand feet
|
| Production Hrs. Annual | 4,932
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $113,676 | 2,546,307 |
kWh
|
$0.045 |
| Electricity Demand | $66,830 | 8,916 |
kW-mo/yr
|
$7.50 |
| Natural Gas | $5,807 | 1,157 |
MMBtu
|
$5.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $18,973 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,268 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.8132: Use less toxic and volatile solvent substitutes | $5,050 | $5,040 | - | - |
$5,050
-
gal
|
- | - | - | |
| 02 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,970 | $5,500 | - | - | - |
$3,970
-
lb
|
- | - | |
| 03 | 3.5113: Sell oil to recycler | $3,900 | - | - | - |
$3,900
-
gal
|
- | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,200 | $500 |
$2,200
96,131
kWh
|
- | - | - | - | - | |
| 05 | 3.5316: Contract a wood pallet recycling company | $1,960 | - | - | - | - |
$1,960
-
lb
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $685 | $14 |
$275
12,016
kWh
|
$410
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 2.8121: Apply for tax-free status for energy purchases | $440 | $800 | - | - | - | - | - | $440 | |
| 08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $360 | - |
$360
42,790
kWh
|
- | - | - | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $268 | $255 |
$70
2,931
kWh
|
$55
-
kW-mo/yr
|
- | - | $143 | - | |
| 10 | 2.6212: Turn off equipment during breaks, reduce operating time | $140 | - |
$140
7,034
kWh
|
- | - | - | - | - | |
| TOTAL RECOMMENDED | $18,973 | $12,109 |
$3,045
160,902
kWh
|
$465
-
kW-mo/yr
|
$8,950
-
gal
|
$5,930
-
lb
|
$143 | $440 | ||
| TOTAL IMPLEMENTED | $9,268 | $1,555 |
$2,770
148,886
kWh
|
$55
-
kW-mo/yr
|
$3,900
-
gal
|
$1,960
-
lb
|
$143 | $440 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs