Assessment Year | 1999 |
---|---|
Principal Product | Assembly of electronic connectors |
NAICS |
n/a
|
SIC | 3678: Electronic Connectors |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
24,000
ft2
|
Annual Production | 65,000
pieces
|
Production Hrs. Annual | 4,294
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,631 | 1,143,025 |
kWh
|
$0.034 |
Electricity Demand | $23,608 | 3,218 |
kW-mo/yr
|
$7.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,955 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $261 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.5217: Reuse / recycle/ sell paper products | $4,670 | $11,000 | - | - |
$4,670
-
lb
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,835 | $14,900 |
$1,510
45,135
kWh
|
$1,325
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $475 | $20 |
$265
7,913
kWh
|
$210
-
kW-mo/yr
|
- | - | - | |
04 | 2.2531: Re-size charging openings or add movable cover or door | $285 | $270 |
$285
8,499
kWh
|
- | - | - | - | |
05 | 2.8118: Check for accuracy of utility / power meters | $259 | - | - | - | - | - | $259 | |
06 | 2.7124: Make a practice of turning off lights when not needed | $261 | $40 |
$125
3,810
kWh
|
$136
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $170 | $250 |
$55
1,758
kWh
|
$20
-
kW-mo/yr
|
- | $95 | - | |
TOTAL RECOMMENDED | $8,955 | $26,480 |
$2,240
67,115
kWh
|
$1,691
-
kW-mo/yr
|
$4,670
-
lb
|
$95 | $259 | ||
TOTAL IMPLEMENTED | $261 | $40 |
$125
3,810
kWh
|
$136
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs