ITAC Assessment: AM0340
ITAC logo
ITAC Assessment: AM0340
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Saturated felt, and coated roofing paper
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 120,600
ft2
Annual Production 2,600,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,765 1,117,819
kWh
Electricity Demand $23,408 3,111
kW-mo/yr
Natural Gas $132,786 46,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $364,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.441: Install automatic packing equipment $204,000 $600,000 - - $204,000 -
02 2.1224: Replace boiler $89,600 $70,000 $89,600
-
MMBtu
- - -
03 3.1192: Reduce scrap production $62,300 - - $62,300
-
lb
- -
04 2.2511: Insulate bare equipment $3,080 $245 $3,080
-
MMBtu
- - -
05 2.2511: Insulate bare equipment $2,260 $785 $2,260
-
MMBtu
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,960 - - - - $1,960
07 2.8123: Pay utility bills on time $830 - - - - $830
TOTAL RECOMMENDED $364,030 $671,030 $94,940
-
MMBtu
$62,300
-
lb
$204,000 $2,790
TOTAL IMPLEMENTED $70,430 $1,030 $5,340
-
MMBtu
$62,300
-
lb
- $2,790
Yearly Savings* Imp'd Cost* Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs