| Assessment Year | 1999 |
|---|---|
| Principal Product | Saturated felt, and coated roofing paper |
| NAICS |
n/a
|
| SIC | 2952: Asphalt Felts and Coatings |
| Sales Range | $10 M to 50M |
| # of Employees | 56 |
| Plant Area |
120,600
ft2
|
| Annual Production | 2,600,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $44,765 | 1,117,819 |
kWh
|
$0.040 |
| Electricity Demand | $23,408 | 3,111 |
kW-mo/yr
|
$7.52 |
| Natural Gas | $132,786 | 46,736 |
MMBtu
|
$2.84 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $364,030 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $70,430 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.441: Install automatic packing equipment | $204,000 | $600,000 | - | - | $204,000 | - | |
| 02 | 2.1224: Replace boiler | $89,600 | $70,000 |
$89,600
-
MMBtu
|
- | - | - | |
| 03 | 3.1192: Reduce scrap production | $62,300 | - | - |
$62,300
-
lb
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $3,080 | $245 |
$3,080
-
MMBtu
|
- | - | - | |
| 05 | 2.2511: Insulate bare equipment | $2,260 | $785 |
$2,260
-
MMBtu
|
- | - | - | |
| 06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,960 | - | - | - | - | $1,960 | |
| 07 | 2.8123: Pay utility bills on time | $830 | - | - | - | - | $830 | |
| TOTAL RECOMMENDED | $364,030 | $671,030 |
$94,940
-
MMBtu
|
$62,300
-
lb
|
$204,000 | $2,790 | ||
| TOTAL IMPLEMENTED | $70,430 | $1,030 |
$5,340
-
MMBtu
|
$62,300
-
lb
|
- | $2,790 | ||
| Yearly Savings* | Imp'd Cost* | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs