ITAC Assessment: AM0335
ITAC logo
ITAC Assessment: AM0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wire beverage racks
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area 64,000
ft2
Annual Production 708,000
lb
Production Hrs. Annual 5,952
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,774 391,559
kWh
Electricity Demand $6,761 2,661
kW-mo/yr
Natural Gas $29,960 5,250
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 4.323: Optimize lot sizes to reduce inventory carrying costs $19,840 $320 - - - $19,840 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,790 $250 $4,790
79,719
kWh
- - - -
03 2.8121: Apply for tax-free status for energy purchases $2,025 $1,015 - - - - $2,025
04 2.3212: Optimize plant power factor $930 $2,585 - $930
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,050 $100 $1,050
17,585
kWh
- - - -
06 2.3212: Optimize plant power factor $525 $1,525 - $525
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $470 - $470
7,913
kWh
- - - -
08 2.7145: Install skylights $370 $850 $370
6,155
kWh
- - - -
09 2.7145: Install skylights $250 $845 $250
4,982
kWh
- - - -
10 3.4154: Eliminate leaks in water lines and valves $180 $100 - - $180
-
Tgal
- -
TOTAL RECOMMENDED $30,430 $7,590 $6,930
116,354
kWh
$1,455
-
kW-mo/yr
$180
-
Tgal
$19,840 $2,025
TOTAL IMPLEMENTED $8,515 $1,465 $6,310
105,217
kWh
- $180
-
Tgal
- $2,025