ITAC Assessment: AM0332
ITAC logo
ITAC Assessment: AM0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel centrifugal castings
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 120,800
ft2
Annual Production 4,700,000
lb
Production Hrs. Annual 3,980
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,691 4,974,502
kWh
Electricity Demand $200,369 23,959
kW-mo/yr
Natural Gas $122,307 42,097
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,895

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings
01 3.4155: Meter waste water $7,230 $8,500 - - $7,230
-
Tgal
- - -
02 3.6113: Remove sludge from tanks on a regular basis $6,620 $16,675 - $(-210.0)
-
MMBtu
- $7,370
-
gal
- $(-540.0)
03 3.8221: Use alternatives for acids / alkaline (water, steam, abrasive) $2,605 $3,090 - - - - $2,605
-
gal
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,700 $2,665 $1,700
61,547
kWh
- - - - -
05 4.513: Re-arrange equipment layout to reduce labor costs $830 $100 - - - - - $830
06 4.611: Begin a practice of predictive / preventative maintenance $775 $1,200 $75
2,638
kWh
- - - - $700
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $460 - $460
24,619
kWh
- - - - -
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $380 - $380
16,706
kWh
- - - - -
09 2.7124: Make a practice of turning off lights when not needed $380 - $380
13,482
kWh
- - - - -
10 2.7121: Utilize daylight whenever possible in lieu of artificial light $350 $20 $350
5,275
kWh
- - - - -
TOTAL RECOMMENDED $21,330 $32,250 $3,345
124,267
kWh
$(-210.0)
-
MMBtu
$7,230
-
Tgal
$7,370
-
gal
$2,605
-
gal
$990
TOTAL IMPLEMENTED $17,895 $29,060 $3,345
124,267
kWh
$(-210.0)
-
MMBtu
$7,230
-
Tgal
$7,370
-
gal
- $160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs