ITAC Assessment: AM0328
ITAC logo
ITAC Assessment: AM0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Steel and non-ferrous metal forgings, heat treating of metal
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 149,750
ft2
Annual Production 20,000
ton
Production Hrs. Annual 6,060
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $443,290 11,325,029
kWh
Electricity Demand $175,899 28,054
kW-mo/yr
Electricity Fees $10,608 -
Natural Gas $1,080,984 384,987
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,250

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $44,420 - - - $44,420
02 3.4155: Meter waste water $23,760 $27,000 - - $23,760
03 2.3212: Optimize plant power factor $11,750 - - $11,750
-
kW-mo/yr
-
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,940 $3,680 $3,940
164,127
kWh
- -
05 2.4314: Use synthetic lubricant $1,635 - $845
35,170
kWh
$790
-
kW-mo/yr
-
06 2.7124: Make a practice of turning off lights when not needed $830 - $280
11,723
kWh
$550
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $500 $500 $500
20,809
kWh
- -
TOTAL RECOMMENDED $86,835 $31,180 $5,565
231,829
kWh
$13,090
-
kW-mo/yr
$68,180
TOTAL IMPLEMENTED $12,250 $500 $500
20,809
kWh
$11,750
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs