Assessment Year | 1998 |
---|---|
Principal Product | Steel and non-ferrous metal forgings, heat treating of metal |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
149,750
ft2
|
Annual Production | 20,000
ton
|
Production Hrs. Annual | 6,060
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $443,290 | 11,325,029 |
kWh
|
$0.039 |
Electricity Demand | $175,899 | 28,054 |
kW-mo/yr
|
$6.27 |
Electricity Fees | $10,608 | - |
|
- |
Natural Gas | $1,080,984 | 384,987 |
MMBtu
|
$2.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,835 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,250 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $44,420 | - | - | - | $44,420 | |
02 | 3.4155: Meter waste water | $23,760 | $27,000 | - | - | $23,760 | |
03 | 2.3212: Optimize plant power factor | $11,750 | - | - |
$11,750
-
kW-mo/yr
|
- | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $3,940 | $3,680 |
$3,940
164,127
kWh
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $1,635 | - |
$845
35,170
kWh
|
$790
-
kW-mo/yr
|
- | |
06 | 2.7124: Make a practice of turning off lights when not needed | $830 | - |
$280
11,723
kWh
|
$550
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $500 | $500 |
$500
20,809
kWh
|
- | - | |
TOTAL RECOMMENDED | $86,835 | $31,180 |
$5,565
231,829
kWh
|
$13,090
-
kW-mo/yr
|
$68,180 | ||
TOTAL IMPLEMENTED | $12,250 | $500 |
$500
20,809
kWh
|
$11,750
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs