ITAC Assessment: AM0317
ITAC logo
ITAC Assessment: AM0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Asphalt roofing shingles
NAICS
n/a
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 141,750
ft2
Annual Production 132,000,000
pieces
Production Hrs. Annual 7,992
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,724 5,788,394
kWh
Electricity Demand $94,940 15,142
kW-mo/yr
Natural Gas $59,358 18,040
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,757

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 3.5311: Recover and reuse waste material $35,800 $137,500 - - - $(-1,800.0)
-
MMBtu
$37,600
-
lb
- -
02 2.3212: Optimize plant power factor $23,300 $25,000 - $23,300
-
kW-mo/yr
- - - - -
03 3.5311: Recover and reuse waste material $12,000 $410 - - - - - $12,000 -
04 3.5311: Recover and reuse waste material $10,900 $9,000 - - - - - - $10,900
05 2.8123: Pay utility bills on time $2,662 - - - $2,662 - - - -
06 2.7111: Reduce illumination to minimum necessary levels $1,540 - $580
24,326
kWh
$960
-
kW-mo/yr
- - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $555 $320 $555
23,154
kWh
- - - - - -
08 2.7124: Make a practice of turning off lights when not needed $540 - $540
22,567
kWh
- - - - - -
09 2.7111: Reduce illumination to minimum necessary levels $130 $24 $70
3,224
kWh
$60
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $87,427 $172,254 $1,745
73,271
kWh
$24,320
-
kW-mo/yr
$2,662 $(-1,800.0)
-
MMBtu
$37,600
-
lb
$12,000 $10,900
TOTAL IMPLEMENTED $16,757 $730 $1,135
47,480
kWh
$960
-
kW-mo/yr
$2,662 - - $12,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs