ITAC Assessment: AM0314
ITAC logo
ITAC Assessment: AM0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Soft drinks, bottled water
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 135,700
ft2
Annual Production 2,448,000
Tgal
Production Hrs. Annual 3,542
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $178,462 4,595,252
kWh
Electricity Demand $67,252 11,842
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $12,090 - - - $12,090
-
lb
-
02 2.3212: Optimize plant power factor $10,380 $2,230 - $10,380
-
kW-mo/yr
- -
03 2.3134: Shift from daytime to nighttime operation $1,640 - - $1,640
-
kW-mo/yr
- -
04 2.7124: Make a practice of turning off lights when not needed $1,640 $220 $1,640
67,995
kWh
- - -
05 2.7124: Make a practice of turning off lights when not needed $1,110 $330 $400
16,413
kWh
$710
-
kW-mo/yr
- -
06 2.7124: Make a practice of turning off lights when not needed $565 $680 $90
3,810
kWh
$60
-
kW-mo/yr
- $415
07 2.7142: Utilize higher efficiency lamps and/or ballasts $260 $610 $110
4,689
kWh
$150
-
kW-mo/yr
- -
TOTAL RECOMMENDED $27,685 $4,070 $2,240
92,907
kWh
$12,940
-
kW-mo/yr
$12,090
-
lb
$415
TOTAL IMPLEMENTED $25,220 $2,560 $400
16,413
kWh
$12,730
-
kW-mo/yr
$12,090
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs