ITAC Assessment: AM0306
ITAC logo
ITAC Assessment: AM0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Clay coated paperboard, gravure preprinted corrugated paperb
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 486,000
ft2
Annual Production 55,000
thousand feet
Production Hrs. Annual 5,946
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,438 11,630,715
kWh
Electricity Demand $202,650 24,099
kW-mo/yr
Electricity Fees $8,783 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,590

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $83,400 - - $83,400
-
kW-mo/yr
- - -
02 3.7198: Reduce / eliminate use of disposable product $27,210 $747 - - - - $27,210
-
lb
03 2.8123: Pay utility bills on time $8,495 - - - $8,495 - -
04 3.4114: Replace city water with recycled water via cooling tower $2,800 $1,115 $(-125.0)
(-4,689)
kWh
$(-145.0)
-
kW-mo/yr
- $3,070
-
Tgal
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,750 - - $2,750
-
kW-mo/yr
- - -
06 2.7145: Install skylights $2,090 $4,310 $2,090
77,374
kWh
- - - -
07 3.5313: Increase amount of waste recovered for resale $830 - - - - - $830
-
lb
08 2.7145: Install skylights $1,740 $5,350 $1,740
64,185
kWh
- - - -
09 2.7124: Make a practice of turning off lights when not needed $1,400 $100 $550
20,223
kWh
$850
-
kW-mo/yr
- - -
10 2.7124: Make a practice of turning off lights when not needed $910 $80 $420
15,533
kWh
$490
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $680 $340 $180
6,741
kWh
$500
-
kW-mo/yr
- - -
12 3.5316: Contract a wood pallet recycling company $300 - - - - - $300
-
lb
TOTAL RECOMMENDED $132,605 $12,042 $4,855
179,367
kWh
$87,845
-
kW-mo/yr
$8,495 $3,070
-
Tgal
$28,340
-
lb
TOTAL IMPLEMENTED $118,590 $7,392 $2,585
95,252
kWh
$84,595
-
kW-mo/yr
- $3,070
-
Tgal
$28,340
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs