Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Portion controlled steaks and patties
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 28,900
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 4,572
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,452 2,543,376
kWh
Electricity Demand $15,603 5,106
kW-mo/yr
Electricity Fees $2,276 -
Natural Gas $7,880 1,772
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,836 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings
01 3.8211: Convert to aqueous cleaning system $870 $1,030 - - - $870
-
gal
02 2.4231: Reduce the pressure of compressed air to the minimum required $410 $350 $140
6,155
kWh
$270
-
kW-mo/yr
- -
03 2.7124: Make a practice of turning off lights when not needed $280 - $280
12,016
kWh
- - -
04 2.8114: Change rate schedules or other changes in utility service $276 - - - $276 -
TOTAL RECOMMENDED $1,836 $1,380 $420
18,171
kWh
$270
-
kW-mo/yr
$276 $870
-
gal
TOTAL IMPLEMENTED $1,560 $1,380 $420
18,171
kWh
$270
-
kW-mo/yr
- $870
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs