ITAC Assessment: AM0289
ITAC logo
ITAC Assessment: AM0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Diesel engine fuel injection components, diesel engine parts
NAICS
n/a
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 234,000
ft2
Annual Production 5,212
pieces
Production Hrs. Annual 2,394
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,041 1,898,300
kWh
Electricity Demand $50,386 7,835
kW-mo/yr
Electricity Fees $6,006 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,870

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $21,800 $5,500 - - - - - $21,800
-
lb
02 2.3512: De-energize excess transformer capacity $1,830 $1,050 $1,590
36,928
kWh
$240
-
kW-mo/yr
- - - -
03 2.7124: Make a practice of turning off lights when not needed $1,330 - $1,330
30,774
kWh
- - - - -
04 3.6124: Burn waste oil for heat $820 - - - - - $820
-
gal
-
05 3.4154: Eliminate leaks in water lines and valves $650 $50 - - - $650
-
Tgal
- -
06 2.8123: Pay utility bills on time $600 - - - $600 - - -
07 2.7124: Make a practice of turning off lights when not needed $440 - $440
10,258
kWh
- - - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $230 $100 $230
5,275
kWh
- - - - -
09 3.5311: Recover and reuse waste material $170 - - - - - $170
-
gal
-
TOTAL RECOMMENDED $27,870 $6,700 $3,590
83,235
kWh
$240
-
kW-mo/yr
$600 $650
-
Tgal
$990
-
gal
$21,800
-
lb
TOTAL IMPLEMENTED $27,870 $6,700 $3,590
83,235
kWh
$240
-
kW-mo/yr
$600 $650
-
Tgal
$990
-
gal
$21,800
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs